Kembla Grange logistics park
Four warehouses poured in sequence over 14 months, with formwork delivered against the pour programme rather than the purchase order.
Projects
Which building, which range, and how much of it. Where a project is named, the builder has agreed to be named.
Four warehouses poured in sequence over 14 months, with formwork delivered against the pour programme rather than the purchase order.
Prefabricated frames cut at Crestmead and craned in lot order, which took the frame stage from nine days to four.
A 38 m single span replacing a timber crossing washed out in the 2022 floods. Hardwood girders milled at Wauchope.
A heritage pub refit where the ceiling had to bring the room's reverberation down without hiding the trusses.
Twenty-four attached dwellings on a tight inner-suburban site, with a tested separating wall system the certifier accepted first time.
The first project supplied out of the Penrose plant after it opened, with ply pressed 12 km from site.
A BAL-29 site where the architect wanted timber. Bushfire-resisting species did it without a coating.
1.2 km of public boardwalk through a flood-prone reserve, specified in composite so the council stopped re-oiling it.